Hyper Open Edge Cloud

How To Ship An ORS

The process to ship an ORS
  • Last Update:2025-04-30
  • Version:009
  • Language:en

Print the checklist

Print and fill the shipping checklist during this process: rapidspace-HowTo.ORS.Shipping.Checklist

Place warning labels on the POE connectors

 

 

 

Please put the following labels before packaging the ORS:

  • "Do not hot plug/unplug" on the POE connector of the ORS enclosure
  • The ORS reference on the end of the POE cable (so that people know which ORS it corresponds to by looking at the POE injector)
  • "WARNING: DO NOT UNPLUG POE BEFORE POWER" on the POE cable next to the waterproof connector:
    • Template to use for Dymo Label printer: 10 spaces + Warning: DO NOT UNPLUG POE BEFORE POWER
    • Print a first label, put it on the cable by wrapping the empty spaces around the cable, then print another label and put it on the back of the first label

Put the ORS back in the enclosure box

Write down the enclosure serial number. Then put the ORS back in the enclosure box.
Arrange the Antennas, N to SMA adaptors, and ORS mount kit in the box as shown on the image.

Prepare the ORS package with accessories

Arrange the ORS box, RJ45 POE cable, and sim cards in the box as shown on the image.

Box dimensions: 310x220x200 mm , 3.5 kg

Close the package

Close the package once you have gone through the checklist